Thursday, August 27, 2009

House August 26, 2009

Electric on Main Floor
View from bottom of basement stairs, the rubble is being cleared today
Start of Boiler room
View of Extention of Basement
Posted by Picasa

Lucas & House 8-26-09

My Pal Lucas
Main Floor, Oak Floor installed
View from the front, notice the shower falsh is in the basin.
View into Madison's room.
Posted by Picasa

Tuesday, August 25, 2009

August 23, 2009

Installation of the downstairs floor.
CG Buoy uprooted by Hurricane Bill, the chain that broke is thicker than my wrist.
Madison jumping.
And it ends with a bow.
Posted by Picasa

Wednesday, August 19, 2009

Tuesday, August 18, 2009

House August 17, 2009

Start of exterior siding
Stiars are in!
Basement, No walls at all
Hibiscus in Backyard
Posted by Picasa

House August 14, 2009

Oak Flooring in Upstairs Apt
Stairs on site
Oak Flooring for Downstairs
The Ladder going Upstairs
Posted by Picasa

Friday, August 7, 2009

VS House 8-6-09 Part 2

Central Air Duct Work
More Ducts
Circut box on the second floor, for the upstairs apt.

View from the Bay Window.
Posted by Picasa

VS House 8-6-09

House from the front of Driveway
The debris is GONE!
In back too!
Red for hot, blue for cold, last time I did this, it was all copper.
Posted by Picasa

Wednesday, August 5, 2009

VS House 8-4-09

Upstairs Plumbing
Upstairs Electrical
Highhats on first floor
View of downstairs from the future front door.
Posted by Picasa

VS House 7-31-09

Cables in roof for speakers
On landing of second floor
The future hub
House from Driveway
Posted by Picasa